Kal property Kicbrote W WCA 45-06 Waterbrook West Community Association Architectural Contro) Committee Guidelines Following are additional Guidelines the Architectural Control Committee (ACC) follows in ascertaining whether a Building Plan, either new or an addition to existing structure, is granted approval.

To establish the ACC’s authority, Article V, Section 2 of the CC&R’s, as amended on 3, May, 1981, reads: “The Committee shall have full power and authority to reject any plans and specifications that do not comply with the restrictions herein imposed or meet its minimum construction requirements of architectural design requirements that might not be compatible, in the sole discretion of the committee, with the design or overall character of the property.”

Authority to enforce the ACC guidelines was given to Waterbrook West Community Association in August of 1982. These records are on file in the Real Property records.

Due to new material being manufactured, the committee deems it necessary to amend or further distinguish the use of certain building materials.

1. The original Deed Restrictions states, “there shall be no corrugated steel or scrap iron roofing”. We wish to further include, any metal type roofing, including “Standing Ridge Seamed” roof but not limited to any variation of the existing metal roofing material. Any type of metal roofing will not be approved.

2. In the Architectural Control Committee Building Guidelines, page one, siding may not cover more than 10% on the ground level of the structure. This should be confined to the rear of the home. The front and sides should be brick, rock or stucco. The “siding” shall include all types of siding including Hardy Plank siding. Hardy Plank can be used for

Pages 1–2

hould be confined to the rear of the home. The front and sides should be brick, rock or stucco. The “siding” shall include all types of siding including Hardy Plank siding. Hardy Plank can be used for trim and on the rear portion of the home. It may also be used on the upper portion of the home, above the first floor level.

3. Under article V in your Deed Restrictions, page 9, it states “in the event the committee fails to approve or disapprove such plans, within 30 days, approval shall not be required. However, not stated, but does apply, the plans that were submitted are approved. Any revisions to the original plans submitted, voids this 30day rule. Plans must be resubmitted for approval.

Also stated in the Deed Restrictions, homes must be completed within one year from time of approval of plans, At the end of one year your plans should be resubmitted to the ACC for review and approval, in the event the home has not been completed. No revisions can be made to plans, at any time, without approval from the ACC.

Page 1 of 1 a Waterbrook West Community Association Architectural Control Committee Plan Approval Guidelines Following are the Guidelines the Architectural Control Committee (ACC) follows in ascertaining whether a Building Plan is granted approval.

To establish the ACC’s authority, Article V, Section 2 of the CC&Rs, as amended, reads: “The committee shall have full power and authority to reject any plans and specifications that do not comply with the restrictions herein imposed or meet its minimum construction requirements or architectural design requirements or that might not be compatible, in the sole discretion of the committee, with the design or overall character of the property.”

To determine an Owner’s Plan compliance, the following are required:

Pages 2–4

ts or that might not be compatible, in the sole discretion of the committee, with the design or overall character of the property.”

To determine an Owner’s Plan compliance, the following are required: e set of Building Plans containing; Responsible Party Name, Address and Contact Number Floor Plan and Exterior Elevations Plot Plan, scaled and dimensioned, indicating: Lot Boundaries (label with Lot and Block Number) 60 foot Building Set-Back Line and Side & Rear Easements Structures, Porches/Decks, Out-Buildings, Driveways and Fences A/C Units and house main Electrical Service Box Water Well & Pressure Tank and Propane Tank Septic System, inclusive proposed leach/sprinkler fields e Samples of exterior materials and colors (i.e. brick, roof tiles, paint swatches) e Copy of City Building Permit Prior to construction start To receive Plan Approval, the following requirements must be complied with: e The Building Set-Back Line in Waterbrook West is 60 feet — NO structure, tank or any other improvement, with the exception of certain fences, leach field(s) or Architectural Control Committee Waterbrook West Community Association Building Permit Application Owner: Name Phone e-Mail Fax Mailing Address Building Site Address Contractor: Name Phone e-Mail Fax Mailing Address _ a Planned Start Date Duration O Days O Weeks © Months TCEQ Well & Septic Permits: © Will be Applied for 1 Will Not be Applied for Project Overview: Attach required documentation WORK MAY NOT COMMENCE PRIOR TO ACC APPROVAL I agree to abide by the Waterbrook West ACC guidelines & Deed Restrictions owner signature contractor signature An application is not considered accepted until endorsed by an ACC member Received by oe Dates

e to abide by the Waterbrook West ACC guidelines & Deed Restrictions owner signature contractor signature An application is not considered accepted until endorsed by an ACC member Received by oe Dates , ILA + hace, Wer Maco.

H-/- 050 Architectural Control Committee Waterbrook West Community Association Architectural Control Committee Building Guidelines Following are the Guidelines the Architectural Control Committee (ACC) abides by to determine whether an application meets requirements and is granted approval.

To establish the ACC’s authority, Article V, Section 2 of the CC&Rs, as amended, reads: “The committee shall have full power and authority to reject any plans and specifications that do not comply with the restrictions herein imposed or meet its minimum construction requirements or architectural design requirements or that might not be compatible, in the sole discretion of the committee, with the design or overall character of the property.”

To determine an Owner’s Project compliance, the following are required: ¢ completed Waterbrook West ACC Building Permit Application.

e dimensioned Plot Plan showing set-backs & easements (minimum 11” x 17” sheet), - show the proposed structure(s), to scale, with distances to lot lines annotated, - include porches/decks, out-buildings, culverts, driveways and fences, - locate A/C Condensers, Water System Pressure Tank and Propane Tank.

e dimensioned Floor Plan & Exterior Elevations (minimum 24” x 36” sheets).

samples of Exterior Materials and Colors (i.e, brick, roof tiles, paint swatches).

copy of Missouri City Building Permit application.

To receive Project Approval, the following requirements must be complied with: e the front Building Set-Back Line is 60 feet - NO structures, tanks or other

Page 5

Missouri City Building Permit application.

To receive Project Approval, the following requirements must be complied with: e the front Building Set-Back Line is 60 feet - NO structures, tanks or other improvement, with the exception of certain fences, leach fields, sprinkler systems, or minor decorative items are allowed between the property line and the front Building Set-Back Line.

e the side Building Set-Back Line is 10 feet - NO structures are allowed between the _ property line and the side Set-Back Line.

e minimum 2,600 square foot floor space is required, with multistory units having a minimum 1,800 square foot requirement for the lowest level.

e garages shall have a minimum 2-car capacity, and garage door openings may NOT face any street contiguous to the Lot upon which the garage is being built.

e masonry blocks must be covered with an ACC approved finish or veneer.

e siding may not cover more than 10% of the ground level on the front or sides.

e roof turbines, plumbing vents and other roof penetration should exit on the back of the house and shall be painted to match the roof.

e propane and water system pressure tanks shall be placed or screened so as to not be visible from any street.

1 of 2 Architectural Control Committee Waterbrook West Community Association © outbuildings must be minimally 8 feet by 10 feet, have a minimum 8 foot ceiling height, with the design, material and color matching the main structure.

the maximum allowable fence height is 5 feet except that the driveway gate may rise higher subject to ACC approval. Bare wire fencing is not allowed, and wire backing may not be heavier than 14 gauge nor have smaller than 2” x 4” openings.

Fencing between the street and the Building Set-Back Line must be at least two-

e wire fencing is not allowed, and wire backing may not be heavier than 14 gauge nor have smaller than 2” x 4” openings.

Fencing between the street and the Building Set-Back Line must be at least twothirds “open” or “see-through” and may not be backed with wire. Design details, material list and fence plot plan are required for approval.

Contractor Conditions & Requirements: work may NOT commence prior to project approval from the ACC. This includes but is not limited to scarifying, dumping fill-dirt, culvert placement, well drilling or septic system installation.

a culvert and an approach comprised of 50 linear feet of gravel, the width of the culvert, must be in place prior to any other work starting. All ingress and egress to the lot must occur across the culvert. Driving through the ditch is prohibited.

a city permit is required to dump fill dirt, and it must be spread within 4 weeks.

a portable toilet must be kept at the site and properly serviced at all times.

a dumpster must be kept onsite, emptied as required and the area kept tidy.

a 4 foot tall, high visibility, security/debris fence must be maintained around the construction perimeter, with a maximum 25’ wide opening allowed at each culvert.

weeds on the lot must be controlled to a height of 9 inches or less.

work hours are limited to between 6:00 am and 8:00 pm Monday through Saturday and between 10:00 am and 6:00 pm on Sunday.

all exterior work must be completed within one year of construction start.

A penalty for violating any points in the ACC Contractor Conditions & Requirements listed above will be assessed at $50/violation/day until the violation is corrected.

Changes, upgrades, additions or deletions to proposed plans, ongoing construction or

Pages 6–7

ctor Conditions & Requirements listed above will be assessed at $50/violation/day until the violation is corrected.

Changes, upgrades, additions or deletions to proposed plans, ongoing construction or existing structures must be submitted for ACC approval prior to implementation.

ACC contact information: ease Dan Millemon Jay Roberts Mike Shayesteh 4730 Peregrine Way 5218 Chinaberry Grove 5123 Raintree Drive 281-431-4315 281-431-0845 281-431-6609 Sandy Collins Ron McCormick fax: 4911 Birdsong Lane 5010 Raintree Drive [email protected] 281-431-0172 281-431-0951 www.waterbrookwest.com ¥ a 2 of 2 Return to: Waterbrook West Community Association Date application received Architectural Control Committee. By association REQUEST FOR HOME IMPROVEMENT APPROVAL In an effort to protect each individual homeowner’s rights and property values, it is required the Article V of the Declaration of Covenants, Conditions and Restrictions that any homeowner considering improvements to their deeded property submit a “Request for Home Improvement Approval” to the Architectural Control Committee of the Waterbrook West Community association prior to initiating work planned on improvements.

Owner’s name Home Phone Address Work Phone What date will you start the project? Finish Who will do the actual work?

See next page for instructions _ see extra Sheets a I understand that the Waterbrook West Community Association will act on the request as quickly as possible and contact me regarding their decision. I agree not to begin the proposed project until the association notifies me of their approval.

SIGNATURE OF THE HOMEOWNER DATE INSTRUCTIONS

I agree not to begin the proposed project until the association notifies me of their approval.

SIGNATURE OF THE HOMEOWNER DATE INSTRUCTIONS 1. Sketch, on the form provided, a plan view of your lot showing property lines, main and side streets, and an outline of your home.

Locate with dimensions your proposed improvements.

Indicate fences on sketch.

Indicate height and style of fence (materials used) If you are building or locating an accessory building, green house, patio, etc., indicate the exact location with dimensions from the property line. NOTE: accessory buildings, etc., will only be approved if they are at least ten (10)feet from the rear property line and ten (10) feet from the side property line.

If you are proposing a room addition, patio, green house, or any other architectural addition or change, the committee will need an elevation and side view. ( use extra paper if details will not fit below.)

e Indicate materials to be used - type of shingles, type and color of brick, trim work etc.

e Make notations of the colors that will be used - exact names. ( submit samples if possible) e Show all pertinent dimensions - height, length, width slope of roof and location of windows, and doors.

e Point out any other important features.

e If improvements will be placed on concrete foundations or slab, indicate size on the sketch Feel free to submit any other materials (photographs, sales literature, catalog pages, etc.) that might help the committee in making an evaluation.

If you have any questions or need extra forms, call the association.

wie wh a s oo SPECIAL INSTRUCTIONS / NOTES